Project management & sustainable renovation

Why choose our solution?

  • Future-proof your investment
  • Reducing the carbon footprint of buildings
  • Reduce energy consumption
  • Shorten construction time by avoiding dismantling and the associated nuisance
  • Committing to a virtuous, cost-effective process

The principle of over-insulation or over-roofing installation

  • Cladding without backing structure (CWoB) for renovations
  • Application over existing rendering or previous veneer
  • Fixing through existing plaster or cladding to the adjoining substrate

bso pose surisolation

Ecological benefits

  • Reducing carbon footprint
  • Materials recycled on site
  • Simplified on-site waste management
  • Reduction of noise pollution and other pollutants generated by the removal process
  • Retention of the insulating properties of the old system: more efficient building

Economic benefits

  • Save time and money
    • No removal + Cladding without backing structure (CWoB) system: 16 times less construction time
  • No need to remove old veneer or insulation
    • Previous investment in ITE perpetuated
  • Avoidance of recycling and waste management costs

Conclusion

  • A sustainable, cost-effective solution
  • Optimizing energy performance
  • A responsible choice for the future

Do you have a question?

77 Chelles Residence Argonne Alpha GRAF 900 Res Reha 23

▶ FIND OUT MORE ABOUT OUR GEO-SOURCED MINERAL MATERIAL

▶ THE LIFE CYCLE OF OUR PRODUCTS (from manufacturing to recycling)

▶ THE REUSE AND RECYCLING OF OUR GROOVED CLADDINGS

▶ THE CARBON ASSESSMENT OF OUR PRODUCTS (EPDs)

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.